MOBIL'S PIPE FREEZE BREAKS NEW GROUND.
Type of article: Article
Summary
THE PIPELINES LOCATED AT THE BASE OF THE PLATFORM AT STATFJORD A OIL FIELD, AT 150 M BELOW SEA LEVEL, ARE COOLED WITH LIQUID NITROGEN IN ORDER TO FORM PLUGS SOLID ENOUGH TO BLOCK THE PIPELINES AND REMOVE CORRODED SECTIONS. (Bibliogr. int. IFP-AFME-CNRS, FR., 88-230-83.
Details
- Original title: MOBIL'S PIPE FREEZE BREAKS NEW GROUND.
- Record ID : 1988-2164
- Languages: English
- Source: Pipes Pipelines int. - vol. 32 - n. 4
- Publication date: 1987
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
- Themes: LNG and LPG
- Keywords: Oil pipeline; Maintenance; Gas pipeline; Cryogenics
-
THE REFRIGERATION STATIONS FOR THE NATURAL GAS ...
- Author(s) : TROLLUX J.
- Date : 1984
- Languages : Italian
- Source: Industria italiana del Freddo - vol. 38 - n. 6
View record
-
COAXIAL PIPING SYSTEM DEVISED AS LNG SPILL PREV...
- Author(s) : PFENNING T. E.
- Date : 1982
- Languages : English
- Source: Pipeline Gas J. - 1982.12; 56-68 (7 p.).
View record
-
PROBLEMS AND SOLUTIONS FOR LNG PIPELINE.
- Author(s) : NGUYEN VAN TUYEN, REGNAUD P.
- Date : 1983
- Languages : English
- Source: Oil Gas J. - vol. 81 - n. 4
View record
-
Trans-Urals replacement NGL line nearing instal...
- Date : 1994/01/24
- Languages : English
- Source: Oil Gas J. - vol. 92 - n. 4
View record
-
Pipeline drying using dehumidified air with low...
- Author(s) : AHMED S. Y., GANDHIDASAN P., FARAYEDHI A. A. al-
- Date : 1998/05
- Languages : English
- Source: Applied Thermal Engineering - vol. 18 - n. 5
View record