Analyses some problems existed in construction of vertical pipe ground-source heat pumps, including the selection of finished elbows for U-type buried pipes. the setting of pipe clamp for U-type pipes, the setting of drainage ditch and slime dam, the determination of buried pipe well spacing and the backfilling of buried pipe wells, etc., and gives some solutions.

Available documents

Format PDF

Pages: 66-69, 65

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 30009605
  • Languages: Chinese
  • Source: HV & AC - vol. 43 - n. 273
  • Publication date: 2013/01