REDUCING CAPITAL COST IN BOILERS AND CHILLERS.

Author(s) : APPLEGATE D.

Type of article: Article

Summary

THE AUTHOR ARGUES THAT POSSIBLE SAVINGS IN CAPITAL COSTS ARE OFTEN FORGOTTEN WHEN THE INCLUSION OF ENERGY SAVING SYSTEMS IN NEW PLANTS ARE DEBATED. TO ILLUSTRATE THE POINT AN EXAMPLE IS INCLUDED SHOWING BOTH PREDICTED ENERGY SAVINGS AND DESIGN CAPITAL SAVINGS WHEN ROTARY HEAT EXCHANGERSARE INSTALLED BETWEEN FRESH AIR INTAKE AND EXHAUST AIR FOR A HONG KONG AIR-CONDITIONING SYSTEM. D.W.H.