SCHOOL BOARD UPDATES HVAC SYSTEMS AND PROCEDURES IN 120 BUILDINGS.
Author(s) : TAMBLYN T.
Type of article: Article
Summary
A MAJOR REFIT PROGRAMME STARTED WITH A CAREFUL SURVEY OF ALL SYSTEMS, AND DOCUMENTATION OF PLANT, MAINTENANCE, CONTROL AND OPERATION FAULTS. EACH PROBLEM WAS EVALUATED ANDRECTIFIED, WITH EMPHASIS ON CONTROLS AND TRAINING. TARGET WAS 15% SAVINGS, AND NEARLY 13% WAS ACHIEVED. A.R.T.
Details
- Original title: SCHOOL BOARD UPDATES HVAC SYSTEMS AND PROCEDURES IN 120 BUILDINGS.
- Record ID : 1992-0330
- Languages: English
- Source: ASHRAE Journal - vol. 33 - n. 3
- Publication date: 1991/03
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (4)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Modernization; Energy saving; School; Air conditioning
-
Hybrid chilled water plant.
- Author(s) : CELUCH J.
- Date : 2001/07
- Languages : English
- Source: ASHRAE Journal - vol. 43 - n. 7
View record
-
Planta híbrida de agua refrigerada.
- Author(s) : CELUCH J.
- Date : 2002/02
- Languages : Spanish
- Source: Instalador - n. 383
View record
-
Upgrading improves comfort conditions and reduc...
- Author(s) : RENSBURG N. J. J. van
- Date : 1997/05
- Languages : English
- Source: S. A. Refrig. Aircond. - vol. 13 - n. 3
View record
-
School building deterioration offers market for...
- Author(s) : TRICK E.
- Date : 1994/06/27
- Languages : English
- Source: Air Cond. Heat. Refrig. News - vol. 192 - n. 9
View record
-
Retrofit of college building HVAC system reduce...
- Author(s) : HAITAS N.
- Date : 1995/03
- Languages : English
- Source: ASHRAE Journal - vol. 37 - n. 3
View record