Six steps for designing ground heat exchangers.
Author(s) : DAVIS G.
Type of article: Article, Review
Summary
Designing ground-coupled heat pump (GCHP) HVAC systems requires careful consideration of system configuration and the ability to clearly navigate the design paths within the owner’s budget. A GCHP system can be either an economical system or a source of continual heartburn for the engineer and owner. Understanding GCHP design considerations and operational requirements is necessary to design an economical and efficient project.
Details
- Original title: Six steps for designing ground heat exchangers.
- Record ID : 30022912
- Languages: English
- Source: Consulting-Specifying Engineer
- Publication date: 2017
Links
See the source
Indexing
- Themes: Heat pumps techniques
- Keywords: Economy; Design; Heat sink; Review; Heat pump; Ground-source system
-
Critical Review on Efficiency of Ground Heat Ex...
- Author(s) : ESWIASI A., MUKHOPADHYAYA P.
- Date : 2020/06
- Languages : English
- Source: Clean Technologies - vol. 2 - n. 2
- Formats : PDF
View record
-
A review on the heat-source tower heat pump sys...
- Author(s) : YAO X., FENG R., LI X.
- Date : 2024/05
- Languages : English
- Source: Energies - vol. 17 - n. 10
- Formats : PDF
View record
-
Recent advancements in geothermal energy piles ...
- Author(s) : KHALIL A., ATTOM M., KHAN Z., ASTILLO P. V., EL-KADRI O. M.
- Date : 2024/07
- Languages : English
- Source: Energies - vol. 17 - n. 14
- Formats : PDF
View record
-
Recent developments of GSHP in Hokkaido.
- Author(s) : NAGANO K.
- Date : 2014/10
- Languages : Japanese
- Source: SHASE - vol. 88 - n. 10
View record
-
Abnormal energy consumption detection for GSHP ...
- Author(s) : XU C., CHEN H.
- Date : 2020/06
- Languages : English
- Source: International Journal of Refrigeration - Revue Internationale du Froid - vol. 114
- Formats : PDF
View record