IIR document

Status of BEPCII cryogenic system.

Author(s) : JIA L. X., WANG L., YANG G. D., et al.

Summary

Main cryogenic facilities including two distribution valve boxes respectively for superconducting cavities and magnets, and two local control valve boxes combined with current leads for superconducting quadruple magnets were fabricated, tested, and installed by Institute of Cryogenics and Superconductivity Technology (ICST) in Harbin for Beijing Electron-Positron Collider Upgrade (BEPCII) by the end of 2005. This paper presents the updated design, test and status of the BEPCII cryogenic system.

Available documents

Format PDF

Pages: 2006-3/ICEC I-A1

Available

  • Public price

    20 €

  • Member price*

    Free

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: Status of BEPCII cryogenic system.
  • Record ID : 2008-0489
  • Languages: English
  • Source: Multiconference CryoPrague 2006 (9th Cryogenics 2006, ICEC 21, ICMC'06)
  • Publication date: 2006/07/17

Links


See other articles from the proceedings (142)
See the conference proceedings