VAV FOR LABORATORY HOODS: DESIGN AND COSTS.
Author(s) : NEUMAN V. A., ROUSSEAU W. H.
Summary
LABORATORIES WITH CHEMICAL FUME HOODS CAN HAVE HVAC SYSTEMS DESIGNED FOR VARIABLE AIR VOLUME (VAV) FOR THE OPTIMUM IN SAFETY AND COST SAVINGS. VARIOUS VAV DESIGNS ARE DISCUSSED. CONTROLS FOR PROVIDING VAV OPERATION OF FUME HOODS ARE OUTLINED. A COMPUTER SIMULATION OF THE ENERGY USAGE FOR CONSTANT VS VARIABLE VOLUME HOOD OPERATION IS PERFORMED. THE ENERGY AND COST SAVINGS ARE DISCUSSED ALONG WITH A CONSTRUCTION COST COMPARISON OF CONSTANT VOLUME WITH VARIABLE VOLUME. AN ECONOMIC ANALYSIS FOR RETROFITTING VAV IN LABORATORIES IS PERFORMED WITH THE VAV SYSTEM IN THIS EXAMPLE HAVING A SIMPLE PAYBACK OF THREE YEARS AND A 35% RATE OF RETURN ON THE DIFFERENTIAL INVESTMENT.
Details
- Original title: VAV FOR LABORATORY HOODS: DESIGN AND COSTS.
- Record ID : 1987-0687
- Languages: English
- Publication date: 1986
- Source: Source: ASHRAE Trans.
vol. 92; n. 1A; 330-346; 9 fig.; 6 tabl.; 9 ref. - Document available for consultation in the library of the IIR headquarters only.
Indexing
-
Variable-air-volume retrofit of an industrial r...
- Author(s) : DOYLE D. L., BENZULY R. D., O'BRIEN J. M.
- Date : 1993
- Languages : English
- Source: ASHRAE Transactions.
View record
-
VARIABLE VOLUME SYSTEMS FOR LABORATORIES WITH F...
- Author(s) : MCGREGOR A.
- Date : 1991/04/07
- Languages : English
View record
-
HVAC CONTROLS IN LABORATORIES: A SYSTEMS APPROACH.
- Author(s) : ANDERSEN C. P., CUNNINGHAM K. M.
- Date : 1988
- Languages : English
View record
-
LABORATORY BUILDING HVAC SYSTEMS OPTIMIZATION.
- Author(s) : NEUMAN V. A., GUVEN H. M.
- Date : 1988
- Languages : English
View record
-
Numerical investigation on ventilation strategy...
- Author(s) : MEMARZADEH F., MANNING A., JIANG Z.
- Date : 2007/06/10
- Languages : English
- Source: Clima 2007. WellBeing Indoors. Proceedings of the 9th REHVA World Congress [CD-ROM + Abstract book].
View record