Nouveau Perishable Cargo Centre : installation du système frigorifique et d'une structure de panneaux isolés à l'aéroport international à Mumbai.

New Perishable Cargo Centre: installing the refrigeration system and the insulated panel structure at Mumbai international airport.

Auteurs : ASWANEY M., GARDE A. S.

Type d'article : Article, Étude de cas

Résumé

Planning, procuring, supplying, installing and commissioning all equipment and materials required for the Perishable Cargo Centre at the Sahar International Airport Mumbai was a challenging assignment as the scope of work involved not only the refrigeration system and insulated panels for the cold room structure but also the material handling, automation, electrical and civil work involved. This article deals with the description of the refrigeration system and the panel structure.

Documents disponibles

Format PDF

Disponible

  • Prix public

    20 €

  • Prix membre*

    15 €

* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)

Détails

  • Titre original : New Perishable Cargo Centre: installing the refrigeration system and the insulated panel structure at Mumbai international airport.
  • Identifiant de la fiche : 2005-2711
  • Langues : Anglais
  • Source : Air Conditioning and Refrigeration Journal - vol. 6 - n. 1
  • Date d'édition : 01/2003

Liens


Voir d'autres articles du même numéro (3)
Voir la source