New Perishable Cargo Centre: installing the refrigeration system and the insulated panel structure at Mumbai international airport.

Author(s) : ASWANEY M., GARDE A. S.

Type of article: Article, Case study

Summary

Planning, procuring, supplying, installing and commissioning all equipment and materials required for the Perishable Cargo Centre at the Sahar International Airport Mumbai was a challenging assignment as the scope of work involved not only the refrigeration system and insulated panels for the cold room structure but also the material handling, automation, electrical and civil work involved. This article deals with the description of the refrigeration system and the panel structure.

Available documents

Format PDF

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: New Perishable Cargo Centre: installing the refrigeration system and the insulated panel structure at Mumbai international airport.
  • Record ID : 2005-2711
  • Languages: English
  • Source: Air Conditioning and Refrigeration Journal - vol. 6 - n. 1
  • Publication date: 2003/01

Links


See other articles in this issue (3)
See the source