5-megawatt high-temperature heat pump with R134a in a Swedish yeast factory.
Author(s) : ENSTROM H., KENNE H., BAILER P., MOSER P.
Type of article: Article
Summary
The pay-back period, defined as investment cost divided by annual savings, is 4.1 years. This is quite satisfactory for a municipal company that provides district heating.
Details
- Original title: 5-megawatt high-temperature heat pump with R134a in a Swedish yeast factory.
- Record ID : 1995-3822
- Languages: English
- Source: ScanRef - vol. 23 - n. 4
- Publication date: 1994/08
Links
See other articles in this issue (2)
See the source
Indexing
- Themes: Industrial heat pumps
- Keywords: Yeast; R134a; Operation; Hot water; Food industry; Design; Sweden; Heat pump; Refrigerating plant; District heating; Chilled water
-
Yeast plant success.
- Author(s) : ENSTROM H., KENNE H., BAILER P., MOSRER P.
- Date : 1994/06
- Languages : English
View record
-
A 5 megawatt, high-temperature heat pump with R...
- Author(s) : ENSTROM H., KENNE H., BAILER P., MOSER P.
- Date : 1994/08
- Languages : German
- Source: Kälte + Klimatechnik (Die) - vol. 47 - n. 8
View record
-
High temperature ammonia heat pump installation...
- Author(s) : EDWARDS B., KALLU R.
- Date : 1998/02
- Languages : English
- Source: AIRAH J. - vol. 52 - n. 2
View record
-
LA PRODUCTION SIMULTANEE D'EAU GLACEE ET D'EAU ...
- Author(s) : LECRIVAIN E., LAROCHE G., VALLOT A.
- Date : 1982
- Languages : French
- Source: International Journal of Refrigeration - Revue Internationale du Froid - vol. 5 - n. 4
- Formats : PDF
View record
-
Bombas de calor a R717 a alta presión: aplicaci...
- Author(s) : KRISTENSEN A. P. R.
- Date : 1997/06
- Languages : Spanish
- Source: Refrig. Frial - n. 43
View record