AIR CONDITIONING AND HEAT PUMP CHARGING PROCEDURES.

Author(s) : ALLEMORE S.

Type of article: Article

Summary

PACKAGED UNITS WORK AT DIFFERENT CONDITIONS ON THE COOLING OR HEAT PUMP CYCLES. IF THE MANUFACTURER'S RECOMMENDED CHARGE IS KNOWN, THE SAFEST WAY IS TO WEIGH IN THIS QUANTITY. TABLES ARE GIVEN TO CHECK FOR CORRECT OPERATION BY MEASURING ANTICIPATED SUPERHEAT, SUBCOOLING, DISCHARGE TEMPERATURES AND CONDENSING PRESSURES. A.R.T.

Details

  • Original title: AIR CONDITIONING AND HEAT PUMP CHARGING PROCEDURES.
  • Record ID : 1990-1189
  • Languages: English
  • Source: Air Cond. Heat. Refrig. News - vol. 177 - n. 13
  • Publication date: 1989/07/24