Summary
The building is a completely closed high-rise office building with intelligent systems. The article presents the air conditioning system design, especially the VAV system and its control, and the smoke proof and exhaust of the building. It summarises the experience in commissioning and operation of the building.
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 2002-1505
- Languages: Chinese
- Source: HV & AC - vol. 31 - n. 140
- Publication date: 2001/06
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (11)
See the source
Indexing
- Themes: Other air-conditioning equipment
- Keywords: Office; High rise; Building; Monograph; Air conditioning
-
High-rise office buildings: air-conditioning sy...
- Author(s) : YANAI T.
- Date : 2003/03
- Languages : Japanese
- Source: SHASE - vol. 77 - n. 3
View record
-
Energy simulation approach to air conditioning ...
- Author(s) : SEKHAR S. C., YAT C. J.
- Date : 1998/11
- Languages : English
- Source: Build. Environ. - vol. 33 - n. 6
View record
-
Sandwich pressurization systems for smoke control.
- Author(s) : MARCHANT R.
- Date : 1992/11
- Languages : English
- Source: ASHRAE Journal - vol. 34 - n. 11
View record
-
Air conditioning design of highrise civil build...
- Author(s) : PAN Y. S.
- Date : 1998/02
- Languages : Chinese
- Source: HV & AC - vol. 28 - n. 120
View record
-
Gruppi frigoriferi per edifici di grande altezza.
- Author(s) : SERVIZI F.
- Date : 2010
- Languages : Italian
- Source: Industria & Formazione - vol. 34 - n. 6
- Formats : PDF
View record