AIR CONDITIONING AND VENTILATION INSTALLATIONS WITH HEAT RECOVERY IN THE RATINGEN HOSPITAL.

[In German. / En allemand.]

Author(s) : SCHMITZ H., MATHEW A.

Type of article: Article

Summary

DESCRIBES THE INSTALLATIONS IN THE NEW AND OLD HOSPITAL BUILDINGS. NOTES IN PARTICULAR THE LAYOUT OF THE HIGH EFFICIENCY FILTERS AND THE CENTRALISED AIR TREATMENT WITH CENTRAL AIR EXTRACTION OVER VOLUME FLOW REGULATORS. TREATS THE CONTROL AND MONITORING FUNCTIONS WITH DIRECT DIGITAL CONTROL AND THE COOLING SUPPLY FOR THE AIR CONDITIONING BY CHILLED WATER UNITS WHICH SIMULTANEOUSLY OPERATE AS HEAT PUMPS FOR HEAT RECOVERY TO SUPPLY THE AIR CONDITIONING SYSTEM WITH HEAT. (INT. BUILD. SERV. ABSTR., GB., 20, N.5, 1985, 13, 85-01510.

Details

  • Original title: [In German. / En allemand.]
  • Record ID : 1986-1618
  • Languages: German
  • Source: Elektrowärme int., A - n. 4
  • Publication date: 1985
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (4)
See the source