Air conditioning design for the New Chengdu Museum.

[In Chinese. / En chinois.]

Author(s) : XIAO W.

Type of article: Article, Case study

Summary

In order to protect the historical relics, the exhibition hall and the relic storage in the museum have strict temperature and humidity requirements. Using the equally strict standard in all parts of the museum will bring about additional investment and energy costs. Appropriate control of temperature and humidity should be adopted according to the different requirements in each part of the museum. The HVAC design of the museum is presented. To meet the different requirement for temperature and humidity in the exhibition hall and the relic storage, the combination of water cooling chillers and air cooling chillers are adopted, and all-air air conditioning units with double fans are used for the exhibition hall, while centrally treated fresh air plus zoned all-air air conditioning units are used for the relic storage. Adjustment is possible for future requirement changes. The design of the air-conditioning system can ensure the heat source is supplied all the year round.

Available documents

Format PDF

Pages: 38-42, 154

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 30009241
  • Languages: Chinese
  • Source: HV & AC - vol. 42 - n. 271
  • Publication date: 2012/11

Links


See other articles in this issue (8)
See the source