AIR CONDITIONING OF THE CENTRAL OFFICE OF SGMB IN CASABLANCA.
LA CLIMATISATION DU SIEGE SOCIAL DE LA SGMB A CASABLANCA.
Author(s) : MAKOWSKI H.
Type of article: Article
Summary
THE DESCRIBED PLANT INCLUDES AN ASSEMBLY OF INDIVIDUAL HEAT PUMPS CONNECTED TO A WATER LOOP, COOLING THE SOUTHERN FACADE AND HEATING THE NORTHERN FACADE, BOTH GLAZED ON FIVE STOREY HEIGHT; RECOVERY OPERATES ON HOT AND COLD. L.R.
Details
- Original title: LA CLIMATISATION DU SIEGE SOCIAL DE LA SGMB A CASABLANCA.
- Record ID : 1982-2063
- Languages: French
- Publication date: 1982/01
- Source: Source: Chauff. Vent. Cond.
vol. 58; n. 1-2; 30-32; 4 fig. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Comfort air conditioning
- Keywords: Heat recovery; Heat pump; Air conditioning
-
LE PLUS GRAND CHANTIER DE BUREAUX D'EUROPE : LE...
- Author(s) : EMERIT E.
- Date : 1989
- Languages : French
- Source: La revue pratique du froid et du conditionnement d'air - vol. 44 - n. 694
View record
-
AIR CONDITIONING AND HOT WATER PRODUCTION AT TH...
- Author(s) : BERTI L., CAPOZIO C.
- Date : 1987/11
- Languages : Italian
- Source: Cond. Aria - vol. 31 - n. 11
View record
-
AIR CONDITIONING AND VENTILATION INSTALLATIONS ...
- Author(s) : SCHMITZ H., MATHEW A.
- Date : 1985
- Languages : German
- Source: Elektrowärme int., A - n. 4
View record
-
Comparison of mechanical home-ventilation systems.
- Author(s) : UMIKER M., WITTWER D.
- Date : 1994/03
- Languages : German
- Source: INFEL Info - n. 1
View record
-
Geothermal central system.
- Author(s) : DURKIN T. H., CECIL K. E.
- Date : 2007/08
- Languages : English
- Source: ASHRAE Journal - vol. 49 - n. 8
View record