THE LARGEST WORKING SITE OF OFFICES IN EUROPE: THE TREASURY AT BERCY (PARIS).
LE PLUS GRAND CHANTIER DE BUREAUX D'EUROPE : LE MINISTERE DES FINANCES A BERCY (FRANCE).
Author(s) : EMERIT E.
Type of article: Article
Summary
DESCRIPTION OF THE AIR CONDITIONING PLANT OF THE NEW FRENCH TREASURY, DESIGNED WITH THE OBJECTIVE OF SAVING MONEY, MAINTENANCE AND OPERATION: UNITS FOR THE PRODUCTION OF ICED WATER, HEAT PUMPS, HEAT RECOVERY AT THE CONDENSERS, CIRCULATION PUMPS WITH VARIABLE VOLUME, GLYCOL WATER/ICED WATER EXCHANGERS, STORAGE AND DESTORAGE OF COLD BY LATENT HEAT, AUTOMATED PRODUCTION OF COLD, CENTRALIZED TECHNICAL MANAGEMENT. J.L.
Details
- Original title: LE PLUS GRAND CHANTIER DE BUREAUX D'EUROPE : LE MINISTERE DES FINANCES A BERCY (FRANCE).
- Record ID : 1990-2536
- Languages: French
- Source: La revue pratique du froid et du conditionnement d'air - vol. 44 - n. 694
- Publication date: 1989
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (1)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Office; Building; Automation; Design; Heat recovery; Heat pump; Air conditioning
-
AIR CONDITIONING PLANT OF THE DANFOSS JAPAN BUS...
- Author(s) : DOI K.
- Date : 1988
- Languages : Japanese
- Source: Refrigeration - vol. 63 - n. 725
View record
-
AIR CONDITIONING AND ENERGY RECOVERY.
- Author(s) : ANTONINI P.
- Date : 1984/02
- Languages : Italian
- Source: Cond. Aria - vol. 28 - n. 2
View record
-
RECOVERY OF HVAC INSTALLATIONS IN CASE OF RESTR...
- Author(s) : BIAGI G.
- Date : 1989/03
- Languages : Italian
- Source: Cond. Aria - vol. 33 - n. 3
View record
-
LA CLIMATISATION DU SIEGE SOCIAL DE LA SGMB A C...
- Author(s) : MAKOWSKI H.
- Date : 1982/01
- Languages : French
View record
-
AIR CONDITIONING AND VENTILATION INSTALLATIONS ...
- Author(s) : SCHMITZ H., MATHEW A.
- Date : 1985
- Languages : German
- Source: Elektrowärme int., A - n. 4
View record