Analysis of load performance of the chillers of central air-conditioning system in Guangzhou Telecommunications Building.
[In Chinese. / En chinois.]
Author(s) : LIN Y.
Type of article: Article, Case study
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30001763
- Languages: Chinese
- Source: Refrigeration - vol. 29 - n. 4
- Publication date: 2010/12
Links
See other articles in this issue (8)
See the source
Indexing
-
Avec la vitesse variable, le conservatoire de m...
- Date : 2006/01
- Languages : French
- Source: Chaud Froid Plomb. - n. 686
View record
-
Quand les centrales de traitement d'air se mari...
- Author(s) : NICOLAS J.
- Date : 2004/05
- Languages : French
- Source: CLIM Prat. - n. 63
View record
-
Smith & Wesson: the story of a chilled-water re...
- Author(s) : BURD A. L., BURD G. S., MAIO M. de
- Date : 2005/03
- Languages : English
- Source: HPAC Engineering - vol. 77 - n. 3
View record
-
Commissioning solves operational issues, saves ...
- Author(s) : KUMAR S.
- Date : 2014/03
- Languages : English
- Source: Consulting-Specifying Engineer - vol. 51 - n. 2
View record
-
Multi-service chilled beams (MSCBs) at the Empr...
- Author(s) : HUTCHINS G., PENNELL N.
- Date : 2003/09/24
- Languages : English
View record