Application of indirect cooling tower to telecommunication machine rooms.

[In Chinese. / En chinois.]

Author(s) : ZHANG J., LU Z., LI Z.

Type of article: Article

Summary

Considering that a telecommunication machine room needs cooling all the year round and the major load is sensible heat, the paper designs an indirect tower cooling system combining cooling tower, plate heat exchanger and air cooler. It presents the main equipments and the determination of their parameters. Taking a machine room in Harbin as an example, it calculates the annual cooling load by DeST software, and compares the energy consumption before and after retrofit. As a result, the annual energy saving potential is 40% compared with the original system and the investment payback period is 1.16 years for the indirect tower cooling system. It analyses the energy saving potential of indirect tower cooling system in 31 cities across China, and concludes that the system can save energy 15 to 40% for most cities.

Available documents

Format PDF

Pages: pp. 120-123

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 2010-1286
  • Languages: Chinese
  • Subject: Regulation
  • Source: HV & AC - vol. 39 - n. 228
  • Publication date: 2009/09

Links


See other articles in this issue (8)
See the source