Argentine plant increases capacity, improves NGL recoveries.
Author(s) : LYNCH J. T., FERNANDEZ C. L.
Type of article: Article
Summary
Total cryogenic processing capacity at Transportadora de Gas del Sur S.A.'s Cerri complex in Bahía Blanca, Argentina is being increased from 22 million cubic metres per day to 40 million cubic metres per day with a future ethane recovery capacity of 1,900 metric tons per day.
Details
- Original title: Argentine plant increases capacity, improves NGL recoveries.
- Record ID : 1998-3329
- Languages: English
- Source: Oil Gas J. - vol. 95 - n. 40
- Publication date: 1997/10/06
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Petroleum industry; Gas; Modernization; Factory; Recovery; Argentina; LNG; Ethane; Cryogenics
-
LNG recovery being hiked by natural-gasoline re...
- Author(s) : RIVAS M. M., BRACHO J. L., MURRAY J. E.
- Date : 1997/07/07
- Languages : English
- Source: Oil Gas J. - vol. 95 - n. 27
View record
-
Pour répondre à l'accroissement de la demande, ...
- Author(s) : BENDANI A., REKKAB O.
- Date : 1993
- Languages : French
- Source: Pét. Gaz arabes - vol. 25 - n. 577
View record
-
Improved plant design and cost reduction throug...
- Author(s) : DURR C. A., COYLE D. A., HILL D. K., RAY S. A., RIOS J.
- Date : 1998/05/04
- Languages : English
- Source: LNG 12: 12th International congress on liquefied natural gas.
View record
-
Developments in natural gas liquefaction.
- Author(s) : FINN A. J., JOHNSON G. L., TOMLINSON T. R.
- Date : 1999/04
- Languages : English
- Source: Hydrocarbon Processing - vol. 78 - n. 4
View record
-
LNG plan adds up.
- Date : 1993
- Languages : English
- Source: Pet. Econ. - vol. 60 - n. 3
View record