Bridging business risk and process safety: the strategic role of Basis Of Design (BOD) in early LNG project development.

Number: 65

Author(s) : TANABE M.

Summary

As LNG projects grow increasingly complex, the boundary between business risk and process safety risk is becoming more blurred. Traditional project risk management focuses on capital and schedule, while process safety often remains confined to technical design. However, catastrophic incidents—whether caused by design oversights, NATECH events, or cyber threats—can compromise not just safety but long-term business viability.
This paper highlights the strategic role of the Basis of Design (BOD) as a bridge between business decision-making and process safety assurance. Developed during Pre-FEED, the BOD sets the foundation for safety integrity, environmental performance, and resilience against emerging hazards.
We argue that integrating early-stage HAZID and business continuity (BC) risk assessments into BOD development enables more robust and inherently safer design outcomes. By doing so, LNG developers can align technical design assumptions with real-world risk realities—strengthening both compliance and lifecycle resilience.

Available documents

Format PDF

Pages: 7 p.

Available

Free

PDF of the presentation slides

Pages: 13 p.

Available

Free

Details

  • Original title: Bridging business risk and process safety: the strategic role of Basis Of Design (BOD) in early LNG project development.
  • Record ID : 30034678
  • Languages: English
  • Subject: Figures, economy, Technology
  • Source: 21st International Conference & Exhibition on Liquefied Natural Gas (LNG2026)
  • Publication date: 2026/02/05

Links


See other articles from the proceedings (66)
See the conference proceedings