Commissioning, preventive maintenance and troubleshooting guide for commercial ground-source heat pump systems.
Author(s) : ASHRAE
Type of monograph: Book, Guide/Handbook
Summary
This book covers the project implementation stage and reviews the necessary technical information for geothermal or geoexchange heat pump systems. Commissioning, maintenance requirements, and troubleshooting for these energy-efficient systems are covered in detail. This guide helps the project engineer make sure that the system is efficiently and effectively designed, installed and operated. It is a valuable reference for those involved in the design, installation, and operation and maintenance of commercial building ground-source heat pump systems.
Details
- Original title: Commissioning, preventive maintenance and troubleshooting guide for commercial ground-source heat pump systems.
- Record ID : 2003-2089
- Languages: English
- Publication: ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers) - United states/United states
- Publication date: 2002
- ISBN: 1931862095
- Source: Source: SP-94; 112 p. (15 x 23); fig.; tabl.; append.; USD 69.
- Document available for consultation in the library of the IIR headquarters only.
Indexing
-
Pompes à chaleur géothermiques : les opérations...
- Date : 2014/07
- Languages : French
View record
-
Commercial/institutional ground-source heat pum...
- Author(s) : ASHRAE
- Date : 1995
- Languages : English
View record
-
Geology and drilling methods for ground-source ...
- Author(s) : ASHRAE, SACHS H. M.
- Date : 2002
- Languages : English
View record
-
Direct geoexchange heat pumps.
- Author(s) : ARI
- Date : 2001
- Languages : English
View record
-
Heat pumps: a guidance document for designers.
- Author(s) : BROWN R.
- Date : 2009/10
- Languages : English
View record