Summary
Short- and long-term prediction methods of cooling water loads, using the Kalman filters. The short-term method predicts loads 30 minutes in advance by using the difference between present loads and those of one week before, as well as temperature and absolute humidity. The long-term method predicts hourly loads of the following day.
Details
- Original title: [In Japanese. / En japonais.]
- Record ID : 1994-2462
- Languages: Japanese
- Source: SHASE - vol. 67 - n. 8
- Publication date: 1993/08
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (5)
See the source