Electricity has the leading role at the Angers Multiplex.
L'électricité tient le haut de l'affiche au multiplexe d'Angers.
Type of article: Article
Summary
The Angers Multiplex, comprising 12 cinemas and other facilities, is fully air conditioned. The plant is equipped with a building technical system and works entirely on electricity. The power drawn is constantly regulated to meet actual needs by permanently monitoring consumption.
Details
- Original title: L'électricité tient le haut de l'affiche au multiplexe d'Angers.
- Record ID : 2002-2623
- Languages: French
- Source: Chaud Froid Plomb. - n. 637
- Publication date: 2001/07
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Energy; Electricity; Auditorium; Monitoring; Monograph; Equipment; Air conditioning
-
Air conditioning system of the New National The...
- Author(s) : ITO M., WADA H., KANAZAWA T., et al.
- Date : 1999/11
- Languages : Japanese
- Source: SHASE - vol. 73 - n. 11
View record
-
Recital hall reconstruction.
- Author(s) : O'BRIEN D.
- Date : 2001/01
- Languages : English
- Source: AIRAH J. - vol. 55 - n. 1
View record
-
Reconstruit dans son ancienne splendeur : Gran ...
- Author(s) : BRINGMANN A., ALKORTA M.
- Date : 2000
- Languages : French
- Source: Rev. tech. Sulzer - Sulzer tech. Rev. - n. 2.
View record
-
Severance Hall renovation hits all the high notes.
- Author(s) : WESSEL D. J.
- Date : 2000/12
- Languages : English
- Source: HPAC Engineering - vol. 72 - n. 12
View record
-
Le complexe cinématographique de Valenciennes (...
- Author(s) : BERT D., HENNART F.
- Date : 1998
- Languages : French
- Source: Qualita - n. 53
View record