Implementing Lean Management principles in HVAC industry using Lean Six Sigma Tools

Author(s) : JAMAL MUSTHAFA K. M.

Type of article: Article

Summary

A lot of difficulties are faced in project execution of HVAC systems, and it takes more than 6-8 months for completion of installation. This article discusses implementation of Lean Management principles to HVAC projects to reduce the ‘mudas’ (Japanese term for ‘wastes’), bottlenecks and consequently the completion time.

Available documents

Format PDF

Pages: 28-50

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: Implementing Lean Management principles in HVAC industry using Lean Six Sigma Tools
  • Record ID : 30021659
  • Languages: English
  • Subject: General information
  • Source: Air Conditioning and Refrigeration Journal - vol. 19 - n. 3
  • Publication date: 2016/05

Links


See other articles in this issue (2)
See the source