Management and control of refrigerating installations.
[In Italian. / En italien.]
Author(s) : BEVILACQUA M., GIACCHETTA G.
Type of article: Article
Summary
An example is given of the application of reticular programming techniques for management and control of work during the installation of a plant for the preservation of fish. Methods of Project Breakdown Structure (PBS), or Work Breakdown Structure (WBS) were used. Suitable correcting measures for coping with any unexpected delay helped assure regular progression of work. E.F.
Details
- Original title: [In Italian. / En italien.]
- Record ID : 1993-1490
- Languages: Italian
- Source: Industria italiana del Freddo - vol. 46 - n. 2
- Publication date: 1992/03
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (2)
See the source
Indexing
- Themes: Specialized cold stores
- Keywords: Automation; Design; Fish; Refrigerating plant; Cold store
-
Iceland: mobile, ultramodern fish processing pl...
- Date : 1994
- Languages : English
- Source: SCANVAC Newsl. - n. 1
View record
-
STATUS OF AND TREND IN ESTABLISHING SMALL-SIZE ...
- Author(s) : SUN R. Z.
- Date : 1985/03
- Languages : Chinese
- Source: J. chin. Assoc. Refrig. - n. 1
View record
-
REFRIGERATION PLANT FOR THE STORAGE OF FRUIT AN...
- Author(s) : KROTKOV V. N., RAEV A. A., LETUNOVSKIJ B. M.
- Date : 1984
- Languages : Russian
- Source: Kholodilnaya Tekhnika - n. 9
View record
-
COLD STORAGE REQUIREMENTS.
- Author(s) : TRAUTMANN J. P.
- Date : 1985
- Languages : English
- Source: Deciduous Fruit Grow. - vol. 35 - n. 2
View record
-
ANALYSIS OF THE COMMERCIAL REFRIGERATING PLANT ...
- Author(s) : PEDROSA C.
- Date : 1987
- Languages : Portuguese
- Source: Encontro nac. Refrig. Ar cond., ENRAC, Lisbonne - 1987.05.19-21; 8 p.; 2 fig.
View record