Management and control of refrigerating installations.

[In Italian. / En italien.]

Author(s) : BEVILACQUA M., GIACCHETTA G.

Type of article: Article

Summary

An example is given of the application of reticular programming techniques for management and control of work during the installation of a plant for the preservation of fish. Methods of Project Breakdown Structure (PBS), or Work Breakdown Structure (WBS) were used. Suitable correcting measures for coping with any unexpected delay helped assure regular progression of work. E.F.

Details

  • Original title: [In Italian. / En italien.]
  • Record ID : 1993-1490
  • Languages: Italian
  • Source: Industria italiana del Freddo - vol. 46 - n. 2
  • Publication date: 1992/03
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (2)
See the source