NEW PROCESS OF NATURAL GAS LIQUEFACTION USING PLATE FIN HEAT EXCHANGERS (BRAZED ALUMINIUM).
Author(s) : GAUTHIER P., MOLARO P., BUFFIERE J. P.
Summary
THE AIR LIQUIDE COMPANY HAS TESTED THE RELIABILITY OF THIS PROCESS BY BUILDING AN INDUSTRIAL PILOT LIQUEFACTION PLANT AND CHECKED THE PERFORMANCE AGAINST CALCULATED PREDICTIONS.
Details
- Original title: NEW PROCESS OF NATURAL GAS LIQUEFACTION USING PLATE FIN HEAT EXCHANGERS (BRAZED ALUMINIUM).
- Record ID : 1984-0853
- Languages: English
- Publication date: 1983/05/15
- Source: Source: Proc. LNG 7 GNL, Jakarta
vol. 1; sess. II; pap. 11; 13 p.; 3 fig. - Document available for consultation in the library of the IIR headquarters only.
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Process; Performance; LNG; Testing; Heat exchanger
-
OFFSHORE LIQUEFACTION OF NATURAL GAS WITH LIQUI...
- Author(s) : BACH W.
- Date : 1990
- Languages : German
- Source: Ber. Tech. Wiss./Rep. Sci. Technol. - n. 64/n. 47
View record
-
Entwicklungen im Gemischkreis-Kaskaden-Prozess ...
- Author(s) : BACH W.
- Date : 2002
- Languages : German
- Source: Ber. Tech. Wiss./Rep. Sci. Technol. - n. 81/n. 63
View record
-
Heat exchangers for base-load LNG plants.
- Author(s) : BAKKE K., NEERAAS B. O., OWREN G.
- Date : 1995/08/20
- Languages : English
- Source: For a Better Quality of Life. 19th International Congress of Refrigeration.
- Formats : PDF
View record
-
Ein neuer LNG Baseload Prozess und die Herstell...
- Author(s) : FOERG W., BACH W., STOCKMANN R., HEIERSTED R. S., PAUROLA P., FREDHEIM A. O.
- Date : 1998/05/04
- Languages : English
- Source: LNG 12: 12th International congress on liquefied natural gas.
View record
-
Application of dynamic simulation for design an...
- Author(s) : NORRAZAK E., ISMAIL H., ARIFFIN M. S., et al.
- Date : 2004/03/21
- Languages : English
- Source: LNG 14. Proceedings of the 14th international conference and exhibition of liquefied natural gas [CD-ROM].
View record