RACHP Systems: the pressure equipment (safety) regulations and pressure equipment directive
Author(s) : IoR
Type of monograph: Guide/Handbook
Summary
This document outlines the requirements of the Pressure Equipment (Safety) Regulations - PE(S)R and Pressure Equipment Directive (PED) for installers of RACHP systems.
In the RACHP sector all the components are supplied by a manufacturer for site installation (assembly) by a specialist third party contractor who might not realise that they then become the manufacturer of the assembly (an integrated and functional whole) under PE(S)R.
With the move to R32 and other A2L refrigerants, classified as PE(S)R group 1 fluid (“dangerous”), this moves many systems from SEP (sound engineering practice) or hazard category 1 into hazard category 2 or higher.
Systems which are category 2 or higher must comply with the PE(S)R and must be assessed by an approved Conformity Assessment Body or under an assessment scheme which has been certified by a Conformity Assessment Body.
Available documents
Format Website
Pages: 3
Available
Free
Details
- Original title: RACHP Systems: the pressure equipment (safety) regulations and pressure equipment directive
- Record ID : 30028738
- Languages: English
- Publication: IOR (Institute of Refrigeration) - United kingdom
- Publication date: 2021/09
-
Equipement sous pression. Terminologie. 1. Pres...
- Author(s) : AFNOR, CEN
- Date : 2002/01
- Languages : French
View record
-
Sécurité des machines : évaluation de l'émissio...
- Author(s) : AFNOR
- Date : 1999/04
- Languages : French
View record
-
Pressure equipment for refrigerating systems an...
- Author(s) : AFNOR, CEN
- Date : 2002/02
- Languages : French
View record
-
Systèmes de réfrigération et pompes à chaleur. ...
- Author(s) : AFNOR
- Date : 2001/08
- Languages : French
View record
-
Avis relatif à l'homologation des matériaux et ...
- Date : 1998/09/10
- Languages : French
View record