Technical efforts focus on cutting LNG plant costs.
Author(s) : AOKI I., KIKKAWA Y.
Type of article: Article
Summary
The article discusses technical aspects, including the processes of liquefaction and purification, compressor and exchanger specifications, storage technology, charging, determination of ship size, etc. Details and figures on existing installations are given.
Details
- Original title: Technical efforts focus on cutting LNG plant costs.
- Record ID : 1997-1324
- Languages: English
- Source: Oil Gas J. - vol. 93 - n. 1
- Publication date: 1995/07/03
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Ship; Calculation; Methane carrier terminal; Methane carrier; Transport; Design; Production; LNG; Heat exchanger; Compressor
-
Qatargas exporting LNG from Qatar's new Ras Laf...
- Date : 1997/02/24
- Languages : English
- Source: Oil Gas J. - vol. 95 - n. 8
View record
-
LNG import terminal on a gravity base structure...
- Author(s) : KUMAR S., NAKACHI I.
- Date : 2007/07
- Languages : English
- Source: Hydrocarbon Processing - vol. 86 - n. 7
View record
-
Combined heat power plant for the gasification ...
- Date : 1996/06
- Languages : English
- Source: CADDET Energy Effic. Newsl. - n. 2
View record
-
LNG facilities for power plants.
- Author(s) : YOSHIMURA T.
- Date : 1997
- Languages : Japanese
- Source: Cryogenics/ Cryog. Eng. - vol. 32 - n. 3
View record
-
The construction of Japan's first LNG satellite...
- Author(s) : HATTORI A., SEKIGUCHI M., YAMAGUCHI K., et al.
- Date : 2007/04/24
- Languages : English
- Source: LNG 15. Proceedings of the 15th International Conference and Exhibition of Liquefied Natural Gas.
View record