THE PROJECT CONSISTS OF 60 DWELLINGS FORMING 10 CLUSTERS OF 6 DWELLINGS EACH. A CENTRALLY INSTALLED GASMOTOR-GENERATOR INSTALLATION OF APPROX 45 KILOW SUPPLIES 4 OUT OF THE 10 CLUSTERS WITH WASTE HEAT AND THE REMAINING 6 WITH ELECTRICITY TO DRIVE INDIVIDUAL HEAT PUMPS. ALL CLUSTERS ARE PROVIDED WITH BACK-UP CENTRAL HEATING. VIA ADDITIONAL INSULATION MEASURES THE HEAT LOSSES ARE REDUCED TO 2/3 OF THE ACTUAL LEVEL IN THE NETHERLANDS. THE COMBINATION OF TOTAL ENERGY AND ELECTRICALLY DRIVEN HEAT PUMPS BRINGS AN ADDITIONAL SAVING OF 40% AS COMPARED TO CENTRAL HEATING OF EACH INDIVIDUAL CLUSTER.

Details

  • Original title: [In Dutch. / En nĂ©erlandais.]
  • Record ID : 1986-1231
  • Languages: Dutch
  • Source: Koeltech. Klim. - vol. 78 - n. 1
  • Publication date: 1985/01
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (2)
See the source