TRUNKLINE LNG RECEIVING TERMINAL.
Author(s) : DURR C. A., KELLOGG M. W., PERRY A. W.
Summary
THIS TERMINAL HAS A BASE LOAD CAPACITY OF APPROXIMATELY 470,000 NM3/H AND A PEAK CAPACITY OF 783,000 NM3/H OF NG.
Details
- Original title: TRUNKLINE LNG RECEIVING TERMINAL.
- Record ID : 1984-0856
- Languages: English
- Publication date: 1983/05/15
- Source: Source: Proc. LNG 7 GNL, Jakarta
vol. 1; sess. II; pap. 16; 24 p.; 5 fig.; 3 tabl. - Document available for consultation in the library of the IIR headquarters only.
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Methane carrier terminal; LNG; USA
-
CALIFORNIA LNG PROJECT CLEARS LAST BIG HURDLE.
- Date : 1981
- Languages : English
- Source: Oil Gas J. - vol. 79 - n. 46
View record
-
LNG import terminal on a gravity base structure...
- Author(s) : KUMAR S., NAKACHI I.
- Date : 2007/07
- Languages : English
- Source: Hydrocarbon Processing - vol. 86 - n. 7
View record
-
LES RESERVOIRS DE GNL DE MONTOIR-DE-BRETAGNE.
- Author(s) : RIOU C.
- Date : 1981
- Languages : French
- Source: Gaz Aujourd'hui - vol. 105 - n. 6
View record
-
RELIABILITY, OPERABILITY AND EFFICIENCY OF LIQU...
- Author(s) : PERES R.
- Date : 1983/05/15
- Languages : English
View record
-
A REASSESSMENT OF THE COVE POINT LNG TERMINAL D...
- Author(s) : OSBORN B.
- Date : 1983/05/15
- Languages : English
View record