A primer on testing, adjusting and balancing.
Author(s) : NOLFO A. P.
Type of article: Article
Summary
When commissioning a large chilled water air conditioning plant, even if the design is particularly good, it is necessary to test each component of the air or water loops, to optimize the capacities and to balance the whole circuits.
Details
- Original title: A primer on testing, adjusting and balancing.
- Record ID : 2002-0354
- Languages: English
- Source: ASHRAE Journal - vol. 43 - n. 5
- Publication date: 2001/05
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (4)
See the source
Indexing
- Themes: Other air-conditioning equipment
- Keywords: Operation; Equilibrium; Air; Optimization; Duct; Testing; Air conditioning; Chilled water; Water circuit
-
El equilibrado hidráulico: una garantía de conf...
- Author(s) : LARA J. de
- Date : 2001/09
- Languages : Spanish
- Source: Instalador - n. 378
View record
-
Colectores de presión diferencial nula en las r...
- Author(s) : LARA J. de
- Date : 2002/06
- Languages : Spanish
- Source: Instalador - n. 387
View record
-
Differential pressure, bypass chilled/heating w...
- Author(s) : LAU K. K.
- Date : 1996
- Languages : English
- Source: Build. Serv. Eng. Res. Technol. - vol. 17 - n. 4
View record
-
HVAC water system balancing.
- Author(s) : JELL F.
- Date : 2001/05/02
- Languages : English
- Source: AIRAH 2001 National Conference Proceedings.
View record
-
Eau glacée : faut-il remettre en cause la conce...
- Author(s) : FEDKIW V.
- Date : 2007/11
- Languages : French
- Source: Chaud Froid Plomb. - n. 706
View record