AIR CONDITIONING AND ENERGY RECOVERY.
[In Italian. / En italien.]
Author(s) : ANTONINI P.
Type of article: Article
Summary
AN AIR CONDITIONING PLANT FOR THE HEADQUARTERS OF A BANK IS DESCRIBED. AS MOST HEAT LOADS COME FROM THE COMPUTER CENTRE AND POWER GENERATING UNITS, IT WAS POSSIBLE TO ACHIEVE HEAT RECOVERY SYSTEMS, IN ORDER TO MINIMISE THE OPERATION OF THE HEAT GENERATORS OF THE CENTRAL HEATING PLANT.
Details
- Original title: [In Italian. / En italien.]
- Record ID : 1985-0254
- Languages: Italian
- Source: Cond. Aria - vol. 28 - n. 2
- Publication date: 1984/02
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Office; Building; Heat recovery; Optimization; Air conditioning
-
OILING THE WHEELS (A NEW OFFICE BUILDING FOR BP...
- Author(s) : BRISTER A.
- Date : 1989/11
- Languages : English
- Source: J. chart. Inst. Build. Serv. - vol. 11 - n. 11
View record
-
LE PLUS GRAND CHANTIER DE BUREAUX D'EUROPE : LE...
- Author(s) : EMERIT E.
- Date : 1989
- Languages : French
- Source: La revue pratique du froid et du conditionnement d'air - vol. 44 - n. 694
View record
-
AIR CONDITIONING PLANT OF THE DANFOSS JAPAN BUS...
- Author(s) : DOI K.
- Date : 1988
- Languages : Japanese
- Source: Refrigeration - vol. 63 - n. 725
View record
-
RECOVERY OF HVAC INSTALLATIONS IN CASE OF RESTR...
- Author(s) : BIAGI G.
- Date : 1989/03
- Languages : Italian
- Source: Cond. Aria - vol. 33 - n. 3
View record
-
HEAT EXCHANGER FOR THE VENTILATION OF RESIDENTI...
- Author(s) : DANIEL H.
- Date : 1991/08
- Languages : German
- Source: Heiz. Lüft.-Klima Haustech. - vol. 42 - n. 8
View record