Air-conditioning system retrofit for an historic office building.
Author(s) : WESSEL D. J.
Type of article: Article
Summary
By 1989, the 68-year old building had 250 tenant-owned packaged air-conditioners, using 1.3 million tons mains water to waste. Five systems were evaluated. The building now has centralised condenser water mains with roof cooling towers and variable speed pumping. A.R.T.
Details
- Original title: Air-conditioning system retrofit for an historic office building.
- Record ID : 1993-1566
- Languages: English
- Source: ASHRAE Journal - vol. 34 - n. 7
- Publication date: 1992/07
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Office; Building; Modernization; Cooling tower; Design; Air conditioning; Condenser
-
SOLVING THE AIR CONDITIONING PROBLEMS IN A REFU...
- Author(s) : HAYWARD T.
- Date : 1986
- Languages : English
View record
-
Modernising office air conditioning installations.
- Author(s) : SODEC F.
- Date : 1997/03
- Languages : German
- Source: Tech. Bau - 81-90; 6 fig.; 7 ref.
View record
-
WATER COOLING TOWERS FOR LLOYD'S OF LONDON REDE...
- Date : 1986/11
- Languages : English
- Source: H&V Eng. - vol. 59 - n. 679
View record
-
Comparative analysis of heat rejection techniqu...
- Author(s) : NASH G., CRANE J.
- Date : 1995/10
- Languages : English
View record
-
Renovation of the Watergate 600 building.
- Author(s) : YU H. C., HARMON J. J., GALWAY J. M.
- Date : 1993/10
- Languages : English
- Source: ASHRAE Journal - vol. 35 - n. 10
View record