Summary
Analyses the feasibility of ground-source heat pump system used in the museum. Considering the characteristics of opening hours and intermittent operation, thinks that thermal balance can be achieved by appropriate design, operation management and outdoor natural cooling source utilization, to guarantee long-term efficient operation of the system.
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30003756
- Languages: Chinese
- Source: HV & AC - vol. 41 n. 255 - vol. 41 n. 255
- Publication date: 2011/10
Links
See the source
Indexing
-
Application of ground-source heat pump air cond...
- Author(s) : LIU Y., XU J., ZHENG K., et al.
- Date : 2011/10
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 255
- Formats : PDF
View record
-
Application of underground tunnel ventilation t...
- Author(s) : WANG J.
- Date : 2011/10
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 255
- Formats : PDF
View record
-
Air conditioning system design of Wuxi Hongshan...
- Author(s) : WANG J., LAO Y.
- Date : 2011/10
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 255
- Formats : PDF
View record
-
Retrofitting hot water supply in a luxury hotel...
- Author(s) : DENG S.
- Date : 2003/12
- Languages : English
- Source: ASHRAE Journal - vol. 45 - n. 12
View record
-
Cold and heat sources and air-conditioning syst...
- Author(s) : ZHANG Y.
- Date : 2013/01
- Languages : Chinese
- Source: HV & AC - vol. 43 - n. 273
- Formats : PDF
View record