Discussion of CCHP system in Beijing South railway station.

[In Chinese. / En chinois.]

Author(s) : HUANG B., ZHU J.

Type of article: Article

Summary

The paper presents the design of combined cooling, heating and power(CCHP)system in the project, including scheme selection, load calculation, system configuration, operation strategy, energy saving analysis and economic evaluation. it considers that using a gas engine is more advantageous than a gas turbine. It suggests using the "electrical demand first" rule for determining the equipment capacities of the CCHP system in the condition of electricity interconnection.

Available documents

Format PDF

Pages: pp. 15-19

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 2010-1613
  • Languages: Chinese
  • Source: HV & AC - vol. 40 - n. 237
  • Publication date: 2010/05

Links


See other articles in this issue (12)
See the source