Four 12-kilowatt/4.5 K cryoplants at CERN.
Author(s) : CLAUDET S., ERDT W., FRANDSEN P. K., GAYET P., SOLHEIM N. O., TITCOMB C., WINKLER G.
Summary
The LEP-2 project involves the installation of 192 superconducting accelerating cavities. Four cryoplants were ordered in 1991, two from Air Liquide (France), and two from Sulzer (now Linde, Switzerland-Germany). Processes, construction, commissioning and acceptance tests of the four plants is described, and their main features are compared.
Details
- Original title: Four 12-kilowatt/4.5 K cryoplants at CERN.
- Record ID : 1995-2053
- Languages: English
- Source: Proceedings of the 15th international cryogenic engineering conference. ICEC 15.
- Publication date: 1994/06/07
Links
See other articles from the proceedings (38)
See the conference proceedings
Indexing
-
A 12/18 kilowatt at 4.5 K helium refrigerator f...
- Author(s) : GISTAU G. M., VEAUX J.
- Date : 1994/06/07
- Languages : English
- Source: Proceedings of the 15th international cryogenic engineering conference. ICEC 15.
View record
-
Cryocooled cooling system for superconducting m...
- Author(s) : CHOI Y. S., KIM D. L., YANG H. S., et al.
- Date : 2009
- Languages : English
View record
-
Pulse tube cryocooler for rapid cooldown of a s...
- Author(s) : LEWIS M. A., TAYLOR R. P., BRADLEY P. E., et al.
- Date : 2009
- Languages : English
View record
-
Aufbauvarianten und Funktionsgestaltung von aut...
- Author(s) : BINNEBERG A., BUSCHMANN H., NEUBERT J., SPÖRL G.
- Date : 1996/11/20
- Languages : German
- Source: DKV-Tagungsbericht 23. 1996 Leipzig.
View record
-
The development of a Vuilleumier cryocooler for...
- Author(s) : SCHWENDTNER M. A., TUCKER A. S.
- Date : 2008/04/21
- Languages : English
- Source: Cryogenics 2008. Proceedings of the 10th IIR International Conference
- Formats : PDF
View record