Summary
This article presents the general situation of the project and the design characteristics of cold and heat sources, water system, ventilation system and smoke control and extraction system.
Available documents
Format PDF
Pages: 103-106
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 2008-2657
- Languages: Chinese
- Source: HV & AC - vol. 38 - n. 6
- Publication date: 2008/06
Links
See other articles in this issue (22)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Commercial building; China; Ventilation; Design; Case study; Energy saving; Air conditioning
-
Energy saving research for the Terminal 2 build...
- Author(s) : LU Y., HU Y., WEI D., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
HVAC system design of Citygroup building.
- Author(s) : LIU X., XIANG X., HE J., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
Night ventilation strategy applied to intermitt...
- Author(s) : LI Z., CAO B.
- Date : 2013/07
- Languages : Chinese
- Source: HV & AC - vol. 43 - n. 279
- Formats : PDF
View record
-
Air-conditioning system design for the Shanghai...
- Author(s) : ZHU X., ZHAO L., SHEN B.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
HVAC system design for the Shanghai Oriental Ar...
- Author(s) : ZHAO L., WU L., YU X., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record