IIR document

Investigation on fouling of enhanced tubes used in a cooling tower water system based on a long-term test.

Author(s) : SHEN C., GAO R., WANG X., et al.

Type of article: Article, IJR article

Summary

In order to investigate the fouling of enhanced tubes, a continuous fouling test on eight enhanced tubes and one plain tube was conducted for 98 days, using a medium fouling potential water as the test water at a water velocity of ~1.6 m/s. Four periods were defined for fouling development based on the test data in this work: introduction period, initial deposit period, rapid deposit period, and stabilization period. The rank of asymptotic fouling resistance of nine test tubes was as follows: Tubes 9 > 7 > 6 > 5 > 1 > 3 > 4 > 2 > 8. The pressure drops of the nine tubes increased by 0.1 kPa to 1.32 kPa due to fouling deposit at the end of the fouling test. A fouling resistance prediction model was developed, which had a maximum error of 0.0645 for predicting the fouling resistance ratio.

Available documents

Format PDF

Pages: 9-18

Available

  • Public price

    20 €

  • Member price*

    Free

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: Investigation on fouling of enhanced tubes used in a cooling tower water system based on a long-term test.
  • Record ID : 30026559
  • Languages: English
  • Source: International Journal of Refrigeration - Revue Internationale du Froid - vol. 104
  • Publication date: 2019/08
  • DOI: http://dx.doi.org/10.1016/j.ijrefrig.2019.05.003

Links


See other articles in this issue (50)
See the source