THE FLADIE GROUNDWATER HEAT PUMP PLANT. EXPERIENCE FROM THE FIRST YEARS OF OPERATION.
Author(s) : ANDERSSON O.
Type of article: Periodical article
Summary
DESCRIBES IN SOME DETAIL THE HEAT PUMP PLANT CONSTRUCTED IN 1983 AND SERVING 212 DWELLINGS WITH SPACE HEATING AND DOMESTIC HOT WATER FROM A CENTRAL HEAT PLANT. TOTAL ENERGY DEMAND IS ROUGHLY 5,000 MEGAWATTHOUR/YEAR. THE HEAT PUMP HAS A MAXIMUM HEATING OUTPUT OF 1,140 KILOWATTS CORRESPONDING TO 60% OF THE PEAK LOAD. DESCRIBES THE ENERGY BALANCE OF THE SYSTEM, THE OPERATION OF THE SYSTEM AND ITS COMPONENTS, THERMOHYDRAULIC ASPECTS, WATER CHEMISTRY PLUS ENVIRONMENTAL AND LEGAL QUESTIONS. NOTES THE COP OF 2.05, WHICH IS SLIGHTLY LOWER THAN EXPECTED.
Details
- Original title: THE FLADIE GROUNDWATER HEAT PUMP PLANT. EXPERIENCE FROM THE FIRST YEARS OF OPERATION.
- Record ID : 1989-0713
- Languages: English
- Source: Swed. Counc. Build. Res. - D9:1988; 57 p.; fig.; tabl.; ref.
- Publication date: 1988
Links
See the source
Indexing
- Themes: Heat pumps techniques
- Keywords: Hot water; Sweden; Heat pump; Performance; Testing; Energy saving; District heating; Underground water
-
L'APPROCHE SUEDOISE DANS LE DOMAINE DES POMPES ...
- Author(s) : JAUDIN F.
- Date : 1984
- Languages : French
- Source: Géotherm. Actual. - n. 1
View record
-
UNE APPLICATION DE CHAUFFAGE PAR POMPES A CHALE...
- Author(s) : PIET R.
- Date : 1986/03
- Languages : French
View record
-
POMPES A CHALEUR A GAZ ET GEOTHERMIE A BEAUVAIS.
- Author(s) : OURS A.
- Date : 1984
- Languages : French
- Source: Gaz Aujourd'hui - vol. 108 - n. 5
View record
-
THERMAL ENERGY FROM THE RIVER LIMMAT./ ENERGIE ...
- Author(s) : TRESCH R.
- Date : 1989
- Languages : French
- Source: Rev. tech. Sulzer - Sulzer tech. Rev. - vol. 71 - n. 2
View record
-
THE UTILISATION OF GEOTHERMAL RESOURCES FOR AIR...
- Author(s) : AMALFITANO S.
- Date : 1983/01
- Languages : Italian
- Source: Energ. altern. - vol. 5 - n. 21
View record