IIR document

Cold energy valorisation in the LNG supply chain.

Author(s) : MARCHAL N.

Summary

In the re-gasification process, the LNG (liquefied natural gas) is pumped and heated before entering the gas distribution network. As the LNG temperature is -162°C in the tanks, it is theoretically possible to recover up to 120 kWh per ton thanks to thermodynamic cycles operating between the LNG temperature and a hot source which can be sea water or ambient air. A new concept of compact, high-speed turbomachinery called moto-turbo-pump (MTP) is proposed to replace conventional high pressure pumps and turbo-expander in the energy recovery cycles. The MTP combines cryogenic space turbo-pumps and high speed electrical motor technologies in a pump/turbine/generator single shaft arrangement, supported by non contact bearings. This concept enables simple, high-performance solutions, as well as safe and reliable operation leading to minimised maintenance. The power produced with these energy recovery systems does not need any fuel combustion and produces zero emissions. Moreover, the performances are drastically increased using wasted heated water from a local power plant as hot source, and there is a strong synergy between the LNG re-gasification process and local power production from economical and environmental point of view.

Available documents

Format PDF

Pages: 2006-3

Available

  • Public price

    20 €

  • Member price*

    Free

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: Cold energy valorisation in the LNG supply chain.
  • Record ID : 2007-1854
  • Languages: English
  • Source: Multiconference CryoPrague 2006 (9th Cryogenics 2006, ICEC 21, ICMC'06)
  • Publication date: 2006/07/17

Links


See other articles from the proceedings (142)
See the conference proceedings