Summary
A particular feature of this system is a set of supply and return solution headers on ethylene solution circuits, so that the solution goes through different pipes in the charging and discharging modes and no freezing occurs in the pipeline. This dual header system changes the primary-secondary pumping system into a simple primary pumping system, in which the solution pumps work for both ice storage and ice melting circulation purposes, resulting in simplified design of the system, reduced floor area of the plant room and lower energy consumption and investment costs.
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 2002-3130
- Languages: Chinese
- Source: HV & AC - vol. 31 - n. 143
- Publication date: 2001/12
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (7)
See the source
Indexing
-
Chilled water storage system for the Jingxin bu...
- Author(s) : ZHAO Q. Z., LI L. S., WANG X. M., WANG Y., XU X. R.
- Date : 1996/06
- Languages : Chinese
- Source: HV & AC - vol. 26 - n. 112
View record
-
Climatisation d'un immeuble de bureaux par PAC ...
- Author(s) : AUDRAN J.
- Date : 2001
- Languages : French
- Source: Qualita - n. 65
View record
-
Thermal energy storage for reduced energy costs...
- Author(s) : WILLIAMS V. A.
- Date : 1999/09/19
- Languages : English
- Source: 20th International Congress of Refrigeration: Refrigeration into the Third Millennium.
- Formats : PDF
View record
-
An ice storage air-conditioning system: China W...
- Author(s) : ZHEN G. Q., LI J.
- Date : 2001/04
- Languages : Chinese
- Source: HV & AC - vol. 31 - n. 139
View record
-
Crystal Tower.
- Author(s) : TAGAMI M., HASEGAWA H., TANOHATA Y., et al.
- Date : 2002/11
- Languages : Japanese
- Source: SHASE - vol. 76 - n. 11
View record