Determining the total costs for technical building services at the initial design stage, in particular for air conditioning and ventilation, heating and cooling.

[In German. / En allemand.]

Author(s) : RAKOCZY T.

Type of article: Article

Summary

Describes via examples, how investment costs, energy costs and capital costs as well as space requirements can be calculated very straightforwardly at the initial design stage for technical building services installations and the requisite ducting. Uses meteorological data for locations in Germany.

Details

  • Original title: [In German. / En allemand.]
  • Record ID : 1998-3732
  • Languages: German
  • Source: Gesund. Ing. - vol. 118 - n. 2
  • Publication date: 1997/04

Links


See the source