Geothermal air conditioning for the new Lithgow hospital.
Author(s) : HARRIS G.
Type of article: Article
Summary
The paper begins with a description of the project and an overview of the principles of geothermal air conditioning. This is followed by a brief analysis of why the system was chosen and a description of the components that make up the system as installed at Lithgow. Energy monitoring, energy guarantee and operating costs are also discussed.
Details
- Original title: Geothermal air conditioning for the new Lithgow hospital.
- Record ID : 2000-2749
- Languages: English
- Subject: General information
- Source: AIRAH J. - vol. 53 - n. 8
- Publication date: 1999/08
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (2)
See the source
Indexing
-
A hospital on the lake.
- Author(s) : LLOYD W.
- Date : 2001/06
- Languages : English
- Source: Consult. Specif. Eng. - vol. 29 - n. 6
View record
-
Le chauffage géothermique, solution économique ...
- Author(s) : GINGLINGER M.
- Date : 2003/04
- Languages : French
- Source: FROID CLIM Mag. - n. 2
View record
-
Dossier : pompes à chaleur. Onze "Rolls" du con...
- Author(s) : GRUMEL N.
- Date : 2001/08
- Languages : French
- Source: CLIM Prat. - n. 41
View record
-
Chauffage géothermique et refroidissement à dis...
- Author(s) : LEONI P.
- Date : 1992
- Languages : French
- Source: Réseaux Chal. - n. 16
View record
-
Utilization of wind energy in space heating and...
- Author(s) : KILKIS I. B.
- Date : 1999
- Languages : English
- Source: Energy Build. - vol. 30 - n. 2
View record