RECOVERY OF REFRIGERATION FROM LNG AT THE METHANE TERMINAL, MONTOIR-DE-BRETAGNE.
RECUPERATION DES FRIGORIES DU GNL AU TERMINAL METHANIER DE MONTOIR-DE-BRETAGNE.
Author(s) : KLEITZ A., MAISONNIER J. N.
Type of article: Article
Summary
THIS PROJECT IS NOT YET ACHIEVED. A GENERATING LOOP CONNECTED TO THE NATIONAL GRID SYSTEM, OPERATING ON THE RANKINE CYCLE, WITH TWO CONDENSATION STAGES, WITH R13 (OR R23) IS PROVIDED. DESIGN OUTPUT: 11 MW (LNG FLOW RATE OF 432 T/H); RECOVERY: 60%. THIS PROJECT IS COMPARED WITH THE PLANT AT FOS-SUR-MER BUT MAINLY WITH VARIOUS JAPANESE DEVELOPMENTS. FRENCH AND JAPANESE CYCLES ARE ILLUSTRATED BY DIAGRAMS. L.R.
Details
- Original title: RECUPERATION DES FRIGORIES DU GNL AU TERMINAL METHANIER DE MONTOIR-DE-BRETAGNE.
- Record ID : 1982-1128
- Languages: French
- Source: Rev. gén. Froid - vol. 71 - n. 10
- Publication date: 1981/10
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Rankine; R23; Methane carrier terminal; Methane; Heat recovery; R13; LNG; Gasification; Thermodynamic cycle; Cycle
-
LA CRYOGENIE AU SERVICE DE L'INDUSTRIE DU GAZ.
- Author(s) : PETIT P.
- Date : 1985
- Languages : French
- Source: Gaz Aujourd'hui - vol. 109 - n. 10
View record
-
CALIFORNIA LNG PROJECT CLEARS LAST BIG HURDLE.
- Date : 1981
- Languages : English
- Source: Oil Gas J. - vol. 79 - n. 46
View record
-
LES RESERVOIRS DE GNL DE MONTOIR-DE-BRETAGNE.
- Author(s) : RIOU C.
- Date : 1981
- Languages : French
- Source: Gaz Aujourd'hui - vol. 105 - n. 6
View record
-
LNG import terminal on a gravity base structure...
- Author(s) : KUMAR S., NAKACHI I.
- Date : 2007/07
- Languages : English
- Source: Hydrocarbon Processing - vol. 86 - n. 7
View record
-
Exxon unit plans big Indonesian LNG export proj...
- Date : 1994/11/21
- Languages : English
- Source: Oil Gas J. - vol. 92 - n. 47
View record