Summary
The article reviews the development of a thermal power plant and its HVAC system. It analyses the function and characteristics of the HVAC system in the plant and presents the status of whole plant heating, workshop heating, main power plant ventilating, electrical equipment room ventilating, central air-conditioning system and dust separation system in the plant. It also suggests to continuously adopt new technology and equipment, select suitable ventilating mode for local conditions, take comprehensive measures for dust separation and carry out energy-saving research.
Available documents
Format PDF
Pages: 1-4; 22
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30005238
- Languages: Chinese
- Source: HV & AC - vol. 42 - n. 261
- Publication date: 2012/03
Links
See other articles in this issue (9)
See the source
Indexing
- Themes: Air conditioning in laboratories and industry
- Keywords: Power plant; Ventilation; Review; Air conditioning; Heating
-
COMMON PROBLEMS OF AN HVAC CONTRACTOR AT A NUCL...
- Author(s) : CHAMBERS T. E.
- Date : 1987
- Languages : English
View record
-
Energy saving discussion on ventilation and air...
- Author(s) : YANG Y.
- Date : 2015/02
- Languages : Chinese
- Source: HV & AC - vol. 45 - n. 300
- Formats : PDF
View record
-
Construction of fans for industrial process and...
- Author(s) : AMCA
- Date : 2014/08
- Languages : English
- Source: ASHRAE Journal - Sup summer 2014
View record
-
AIR CONDITIONING SYSTEMS FOR THE NUCLEAR POWER ...
- Author(s) : DEL MASCHIO A.
- Date : 1990/06
- Languages : Italian
- Source: Cond. Aria - vol. 34 - n. 6
View record
-
HVAC design for a sustainable lab.
- Author(s) : JOHNSON G. R.
- Date : 2008/09
- Languages : English
- Source: ASHRAE Journal - vol. 50 - n. 9
View record