THE HEATING AND COOLING REQUIREMENTS OF THE POWER HOUSE MUSEUM.
Author(s) : MORGAN M. E., HOGAN G. D.
Type of article: Article
Summary
THIS MUSEUM HAS A YEAR-ROUND NEED FOR HEATING, COOLING AND REHEAT. THE 4 WATER CHILLERS/HEAT PUMPS ARE CONTROLLED SO THAT UNITS ON CHILLING CYCLE HAVE THE COOLEST CONDENSER WATER. LOAD PROFILES AND CONTROL SYSTEM ARE DESCRIBED. A.R.T.
Details
- Original title: THE HEATING AND COOLING REQUIREMENTS OF THE POWER HOUSE MUSEUM.
- Record ID : 1989-2432
- Languages: English
- Source: AIRAH J. - vol. 43 - n. 1
- Publication date: 1989
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
- Themes: Air conditioning in laboratories and industry
- Keywords: Heat pump; Museum; Air conditioning
-
MUSEE - THEATRE DE NICE : LA CLIMATISATION OPTI...
- Author(s) : GINISTY I.
- Date : 1991
- Languages : French
- Source: La revue pratique du froid et du conditionnement d'air - n. 740
View record
-
THE AIR CONDITIONING PLANT OF PALAZZO GRASSI, V...
- Author(s) : GAUNA P., LEVI F., BATTILORO A.
- Date : 1986/08
- Languages : Italian
- Source: Cond. Aria - vol. 30 - n. 8
View record
-
La climatisation : exemple d'un bâtiment pour l...
- Author(s) : ADRIEN S.
- Date : 1992/10
- Languages : French
- Source: Qualita - n. 32
View record
-
DRESS SENSE -CLIMATE CONTROL FOR COSTUME MUSEUM.
- Date : 1989/03
- Languages : English
- Source: J. chart. Inst. Build. Serv. - vol. 11 - n. 3
View record
-
LIGHT, AIR AND ARCHITECTURE.
- Date : 1987
- Languages : English
- Source: J. chart. Inst. Build. Serv. - vol. 9 - n. 7
View record