Yards gear up for LNG carrier production.
Type of article: Periodical article
Summary
The article reports on the efforts of shipyards in France, Finland and South Korea to gain market share in this promising sector. Current 125-135.000 m3 capacity designs specify four cargo tanks, rather than five or six. Details are given on construction of the cargo tanks, and, in particular, their insulation.
Details
- Original title: Yards gear up for LNG carrier production.
- Record ID : 1995-2730
- Languages: English
- Source: MER - 27-28; 1 fig.; 2 phot.
- Publication date: 1994/08
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: France; Ship; Sea transport; Design; Tank; Korea Republic; Research; LNG; Finland
-
First South Korean LNG carrier delivered.
- Date : 1994/10
- Languages : English
- Source: Mot. Ship - vol. 75 - n. 891
View record
-
Gas tank construction process is productive.
- Author(s) : PARKER S.
- Date : 1994/12
- Languages : English
- Source: Mot. Ship - vol. 75 - n. 893
View record
-
LNG carrier using membrane tank system delivered.
- Date : 1993/12/06
- Languages : English
- Source: Oil Gas J. - vol. 91 - n. 49
View record
-
Trial design of a liquefied CO2 carrier.
- Author(s) : KOBAYASHI Y., ISA H.
- Date : 1994/08
- Languages : Japanese
- Source: Trans. Soc. nav. Arch. West Jap. - n. 88
View record
-
Pressure build-up type LNG carriers in LNG seco...
- Date : 2005/09/29
- Languages : English
- Source: 1st International conference on small-scale LNG in Europe. Conference presentations [CD-ROM].
View record