Gas tank construction process is productive.
Author(s) : PARKER S.
Type of article: Article
Summary
The article describes a new spherical LNG tank production method. The tanks are built in covered facilities in three sections, hence minimising the welding to be carried out on board. The present rate of output is eight tanks a year although this could be increased to twelve if required.
Details
- Original title: Gas tank construction process is productive.
- Record ID : 1996-0688
- Languages: English
- Source: Mot. Ship - vol. 75 - n. 893
- Publication date: 1994/12
Links
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Ship; Sea transport; Design; Tank; Sphere; Process; LNG
-
Turbulent thermal flow analysis of liquefied na...
- Author(s) : KOBASHI Y.
- Date : 1993/06
- Languages : Japanese
- Source: J. Soc. nav. Archit. Jap. - vol. 173
View record
-
Kvaerner's investment at Turku for LNG tank fab...
- Date : 1994/09
- Languages : English
- Source: Nav. Archit. - E 428 (2 p.); 4 fig.
View record
-
LNG carrier using membrane tank system delivered.
- Date : 1993/12/06
- Languages : English
- Source: Oil Gas J. - vol. 91 - n. 49
View record
-
Trial design of a liquefied CO2 carrier.
- Author(s) : KOBAYASHI Y., ISA H.
- Date : 1994/08
- Languages : Japanese
- Source: Trans. Soc. nav. Arch. West Jap. - n. 88
View record
-
Yards gear up for LNG carrier production.
- Date : 1994/08
- Languages : English
- Source: MER - 27-28; 1 fig.; 2 phot.
View record