Summary
Analyses the heat and moisture handling processes of three different air conditioning systems: the primary return air system, secondary return air system and humidity priority control system in which the fresh air eliminates the whole moisture load. Calculates a project example and the results show that the humidity priority control system is easy to achieve and control; the fresh air handling requirement can be satisfied by the dual cold sources equipped with conventional cooling coil and mechanical refrigeration; the humidity priority control system has more significant energy saving effect than the primary return air system.
Available documents
Format PDF
Pages: 40-45
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30010038
- Languages: Chinese
- Source: HV & AC - vol. 42 - n. 267
- Publication date: 2012/08
Links
See other articles in this issue (4)
See the source
Indexing
-
Development of a super nano clean room.
- Author(s) : HASEBE H., NAGOYA H., SUZUKI Y., et al.
- Date : 2009/07
- Languages : Japanese
- Source: SHASE - vol. 83 - n. 7
View record
-
Clean room energy efficiency.
- Author(s) : MATHEW P. A., TSCHUDI W., SARTOR D., et al.
- Date : 2010/10
- Languages : English
- Source: ASHRAE Journal - vol. 52 - n. 10
View record
-
LES SALLES BLANCHES DANS L'INDUSTRIE.
- Author(s) : MARIE D., MOREL F.
- Date : 1981
- Languages : French
- Source: La revue pratique du froid et du conditionnement d'air - vol. 36 - n. 518
View record
-
OBJECTIF < ZERO PARTICULE > (POUR LES SALLES PR...
- Author(s) : LOISON M.
- Date : 1989/11
- Languages : French
- Source: Agro Ind. - n. 54
View record
-
Les salles propres : un marché qui doit être bi...
- Date : 1994/06
- Languages : French
- Source: Chaud Froid Plomb. - vol. 48 - n. 559
View record