Summary
According to the process characteristics and air conditioning settings, preheating the fresh air with the exhaust air from the primary process of the cigarette factory is adopted. The hourly heat recovery energy of three schemes under the typical year operating condition is calculated, the schemes from the perspective of economy, heat recovery quantity and implementation conditions of the plant room are compared and analysed. The results show that the total heat recovery is suitable for this project and the humidifying method has a limited impact on the amounts of heat recovered.
Available documents
Format PDF
Pages: 87-90, 44
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30009132
- Languages: Chinese
- Source: HV & AC - vol. 43 - n. 274
- Publication date: 2013/02
Links
See other articles in this issue (7)
See the source
-
Energy efficiency for semiconductor manufacturi...
- Author(s) : COHEN R. M.
- Date : 2003/08
- Languages : English
- Source: ASHRAE Journal - vol. 45 - n. 8
View record
-
The diagnosis of energy conservation for buildi...
- Author(s) : SHIMIZU M.
- Date : 2007/05
- Languages : Japanese
- Source: SHASE - vol. 81 - n. 5
View record
-
ADVANCED AIR CONDITIONING SYSTEM FOR CHEESE STO...
- Author(s) : VISWAT E.
- Date : 1989
- Languages : Dutch
- Source: Voedingsm. Technol. - vol. 22 - n. 9
View record
-
Application analysis of liquid desiccant air co...
- Author(s) : WU W., WANG R.
- Date : 2012/12
- Languages : Chinese
- Source: HV & AC - vol. 42 - n. 272
- Formats : PDF
View record
-
NEW AIR CONDITIONING UNITS FOR CHEESE FACTORIES.
- Date : 1989
- Languages : German
- Source: Dtsch. Molk.-Ztg. - vol. 110 - n. 4
View record